Thursday, 27 March 2014

Risk Assessment

Risk Assessment

In my risk assessment I will outline potential risks and how to overcome or avoid them. The main risk in our project is the fact that part of our project takes place from a height. This is a risk because we could drop the camera and hurt someone. Also because people may see us up on the balcony and think there is danger.

Location- Hemel Hempstead town centre 

Hazard 1- 
Electrical equipment 
Potential injuries/damages
Falling camera
Tripping over the tripod
Precautions taken 
Fasten the camera as tight as possible to ensure it is safely attached
Take extra care when moving around the equipment 
Responsible
Me (Lewis) and Kieran (2 people)


Hazard 2-
Balcony
Potential injuries/damages
Falling over the edge and dying
Precautions taken
Be careful when near the edge
Stay behind the protective glass  
Responsible 
Me (Lewis) and Kieran (2 people)






No comments:

Post a Comment